New Turbines & Diesels 2017 Power Equipment Catalogue

It is the most complete Power Equipment Catalogue ever appeared in print. It contains detailed information about gas turbines, diesel and gas engines, and power plants on their base.

On the 700 pages of the new version of the Catalogue are presented nearly 20,000 models of power equipment, about 800 companies are in the address section.

Turbines & Diesels Magazine

Turbines & Diesels #5-2017

IN BRIEF

#5 (September-October) 2017

Articles:

  • Gas engine power station in Tazovsky settlement on Yamal peninsula.
  • Decrease of load technological minimum of CCPP equipped with three-level pressure HRSGs.
  • MAN Diesel & Turbo SE’s Medium Speed Gas Engine Portfolio – a Modular Matrix Design.
  • Energas: compressors are ready for full-scale operation.
  • The heat treatment effect on structure and properties of VIN5 intermetallic nickel alloy.
  • ANAC – the program for lubricating oil monitoring.
  • Online CHP plant maintenance with VPN router.
  • CHP plants for woodworking enterprises on the base of biomass: advantages and operation experience.
  • Lukoil Efforce 4004 oil for gas engines: effectiveness confirmed by tests.
  • Scientific and technical session devoted to gas turbines.
  • XXI international specialized exhibition RosGazExpo ‘2017.

News

Two GPA-16 gas pumping units were manufactured and supplied by Iskra-Neftegas сompressor company for booster compressor station of Beregovoye oil & gas field (Sibneftegas). The first stage of the station is used for gas pressure boosting upstream of Beregovoye-Zapolyarnoye cross-country natural gas pipeline. GPA-16 hangar gas pumping units were developed on the base of NK-16-18STD gas turbine engines rated at 16 MW.

Fri, 12/08/2017

Plant for associated petroleum gas compressionTwo plants will be used for transportation of associated petroleum gas of first stage of separation delivered from booster compressor stations of Yuzhno-Vatlorskoye, Vatlorskoye, Suryeganskoye, Verkhnekazymskoye fields and the field named after I.N. Logachev. Compressor plants were developed on the base of oil-flooded screw-type compressors. They will provide final treatment, compression and delivery of associated petroleum gas to the pipeline on a continuous basis under the pressure of 2.2 MPa. The output of each compressor plant is 10000 m3 per hour. All installation and commissioning works for the equipment were carried out by the specialists of Energas Group of Companies.

Wed, 12/06/2017

UTW signed an agreement with the State Electricity Production Association Belenergo on promising cooperation under the power engineering projects implemented in the Republic of Belarus. Following on from the agreement the parties signed a contract on the Ural Turbine Works’ participation in the reconstruction of Minsk TPP-3 (RUE Belenergostroy is a general contractor under the project).

Mon, 12/04/2017

Gas pumping unit on the base of SGT-400 gas turbines

Under the contract Siemens supplied gas pumping units developed on the base of SGT-400 gas turbines each rated at 13.4 MW. Gas pumping units are installed in separate buildings. General designer for the project is Kazakh Institute of oil and gas. General contractor of the compressor station is DO KNISG. It is the first stage of the project. Similar units will be supplied to Baykonur, Saksaulsk, Chernak and Karaozek compressor stations of the pipeline.

Thu, 11/30/2017

Under the contract GrandMotors produced, delivered, installed and commissioned diesel power plant for emergency stand-by power supply of perinatal center in Tambov. GMD550 (GMGen Power Systems) power plant is rated at 400 kW. It was developed on the base of Doosan DP158LDF diesel engine. Power equipment is installed in Sever BKS-1 container. The project was realized under the program of perinatal center in Russia development under the order of Rostech State Corporation. The program specified the construction of 32 new perianal centers during the period of 2013-2016. GrandMotors delivered stand-by power plants to 16 of such centers.

Tue, 11/28/2017

Noyabrskaya CCPPScheduled maintenance was carried out on General Electric MS6001B gas turbine plant and Т-15.5/20.3-5.4/0.2 steam turbine (Kaluga turbine plant) of second power unit of the station. Under the maintenance program gas turbine stripping was fulfilled with rotor roll-out and replacement of 1…3 stage blades, inspection of bearings condition and lubricating oil replacement. For steam turbine opening of the cylinder, rotor roll-out, inspection of mounting bearings and hot path components were carried out. After maintenance and repairing second power unit was put into operation. All works were produced by the specialists of Intertechelectro-Turbomontazh (a part of Intertechelectro Group of Companies).

Mon, 11/20/2017

9HA.01 gas turbine power plant on the site of Kazanskaya TETs-3New gas turbine power station rated at 405.6 MW was commissioned on the site of Kazanskaya TETs-3. The project was realized under the program of complex modernization of the station. It is the first power unit commissioned in Russia on the base of 9HA.01 gas turbine manufactured by GE. In result total electric output of the station was increased from 384 up to 789.6 MW. The main task of the project is to provide electric power for the wholesale market of Tatarstan and generate steam for the technological needs of Kazanorgsintez PJSC. The project of power plant construction was realized by GE in cooperation with Gama Power Systems Engineering and Contracting. 9HA gas turbine has high operational flexibility thanks to advanced digital control system. It gives the opportunity to start the plant very quickly and switch to the operation with part loads with high efficiency.

Wed, 11/15/2017
Syndicate content