Power-Gen Europe 2011

Now in its nineteenth year, POWER-GEN Europe is recognized as the must attend event for the international power industry. As Europe’s largest electricity industry event, POWER-GEN Europe offers unrivalled networking opportunities with a dedicated and diverse trade show floor and a multi-track conference.

Both conference and exhibition floor attract the industry’s leading professionals and key decision makers, whose innovation and expertise are helping to shape the future of electric power production and usage.

POWER-GEN 2011 focuses on:

* Current policy debates and business solutions
* New technologies and systems
* Networking among peers and vendors
* Learning from the experiences of experts in the field

Join us in Milan for Europe’s largest power industry networking event!

Date: 
7-9 June
Place: 
Fiera Milano, Milan, Italy
Begin date: 
2011-06-07
End date: 
2011-06-10

REenergy - 2011

The Russian Ministry of Energy and the OJSC “Exposition Hall “Elektrifikatsiya” invite you to take part in the 2nd International Exhibition and Conference on Renewable Energy and Alternative Fuel

The Russia’s new Energy Strategy for the period until 2030 lays down the blueprint of the prospective efficient and economically viable expansion of using various renewable energy sources for generation of electricity and heat. The Strategy also addresses wider use of alternative fuels in the transportation and energy industries.

ABOUT THE EXHIBITION: The 2nd International Exhibition and Conference on Renewable Energy and Alternative Fuel REnergy 2011 will enable amalgamation of experience and innovative achievements of Russian organizations and companies and those of foreign companies.

Date: 
May 24–26, 2011
Place: 
All-Russia Exhibition Centre, Moscow, Russia
Begin date: 
2011-05-24
End date: 
2011-05-26

Announcement

 

 

 

Turbines & Diesels 2011 Power Equipment Catalogue

It is the most complete Power Equipment Catalogue ever appeared in print. It contains detailed information about gas turbines, diesel and gas engines, and power plants on their base.

In total technical information about more than 12 000 models of power equipment is presented in the Catalogue

Turbines & Diesels Magazine

№5 (September-October) 2011

Articles:

  • Casing-head gas flares will be out on Yuzhno-Priobskoye oil field.
  • Energoproject booster compressor stations application for casing-head gas utilization as the fuel for gas turbine power plants.
  • Saturn-Gas Turbines, JSC gas engine power plants.
  • The Man Diesel Combined Cycle and its influence on the carbon footprint.
  • Gas turbine power plants istallation costs as a criterion of equipment selection.
  • Motor Sich on power equipment market.
  • Two-stage turbine section efficiency estimation method.
  • Inmesol Ltd. technical seminar.
  • ASME Turbo Expo '2011.
  • XI Anniversary St. Petersburg International Energy Forum.
  • LVIII scientific and technical session of Russian Academy of Sciences devoted to gas turbine issues.
  • 2nd Yaroslavl energy forum.

News

The station was constructed under the contract with Saturn Ltd. – manufacturer of metal furniture for storages and warehouses. The station consists of two Capstone C65 microturbine power plants each rated at 65 kW. They are equipped with waste heat utilization systems. Generated thermal power is used for facilities heating.

 

 

20.01.2012

The project of the station construction was developed by Eneka consulting company. General contractor for the project is Promenergoservice. The main power equipment was supplied by MT Technologies (Saint-Petersburg).

The station consists of five Capstone C200 microturbine power plants each rated at 200 kW. Total electric output of the station is 1000 kW, thermal output is 1860 kW. The station operates on base mode in parallel with main power grid. Natural gas is the main fuel for the station.

 

 

18.01.2012

The customer of the station is Micran NPF. The main power equipment was supplied Prodex company. It is also general contractor and general designer of the project.

The station consists of two Caterpillar G3412C gas engine plants each rated at 360 kW and two Caterpillar G3508 gas engine plants each rated at 505 kW. The plants are equipped with SR4B electric generators with voltage of 0.4 kV. The station is also equipped with two KU-700 waste heat boilers each rated at 700 kW delivered by Russky Dom Ltd. and Thermax Inc. ProChill LT 31 T absorption chiller with output of 750 kW.

17.01.2012

The unit consists of two Waukesha APG1000 gas engine power plants each rated at 1 MW. The plants were designed around 16V150LTD gas engine and Leroy-Somer 54.1-VL10 electric generator with voltage of 0.4 kV. The plants are equipped with Enalco waste heat boilers. The project was developed by Melian Company. General contractor for the project is Teplitsenergostroy Ltd.

 

 

16.01.2012

Power station is situated in Takhtamukay settlement. The customer of the project is Tander JSC. The station consists of five Petra 2500C gas engine power plants each rated at 1986 kW. The plants are designed around MWM TCG 2020 V20 gas engines and Marelli Motori electric generators.

 

11.01.2012
Syndicate content