Five Siemens SGT-400 gas turbines were commissioned at Verkhnechonskoye field.

The project has been realized under the contract with Rosneft Oil Company. Total electric output of the station is 64 MW. It generates electric power for the needs of field infrastructure. The main fuel is associated petroleum gas from the field. The plants are installed in the separate building.

Дата публикации: 
Thu, 06/16/2016
Хранить в архиве: 
Xранить