New microturbine station provides power supply for office buildings in Barybino settlement (Moscow region).

The station consists of three ENEX 65 microturbine plants equipped with waste-heat boilers. Total electric output of the station is 195 kW. Thermal output of the station is 345 kW. It is transferred to core circuit of peak boiler house.

Дата публикации: 
Wed, 07/13/2016
Хранить в архиве: 
Xранить