Back up power supply system was created on the site of Moscow-III data center at Kurchatovsky Institute.

The customer of the project is Rostelekom PJSC. The project is realized by the specialists of Ingross Ltd. The system was created on the base of six dynamic uninterruptible power supply units delivered by Eurodiesel Ltd. The units are developed around MTU diesel engines. Each unit size is 1760 kW. The first stage of the system was commissioned during 6 months. The equipment has shop design and is installed in separate building.

 