Gas engine power plants each rated at 4.5 MW were commissioned in the Southern Urals.

MKS Group of Companies commissioned modular power station with total electric output of 18 MW. The project is realized for Svetlinskaya gold-processing factory in Plastovsky district of Chelyabinskaya Region. The station consists of four MWM TCG 2032B gas engine plants. The concept of the modular power plant consists of smaller auxiliary container units which can be produced in parallel with the genset, are easier to transport and very fast to assemble.

Дата публикации: 
Tue, 09/10/2019
Хранить в архиве: 
Xранить