UEC-Aviadvigatel JSC signed the contract for the delivery of two Ural-6000 gas turbine power plants each rated at 6 MW to the site of Pyakyakhinskoye oil and gas condensate field. The customer of the equipment is Lukoil-Western Siberia company (TPP Yamalneftegas). At present power station consists of six EGES Ural-6000 modular gas turbine power plants. They were developed on the base of GTU-6P gas turbine plants. For the moment their total operating time is 150 000 hours.